Annexe extensions in Irvine
A annexe extension in Irvine starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in IrvineFrom £53,500 inc VAT
- PlanningScottish householder rules; building warrant needed
- Build time16–24 weeks on site
- Postcode districtsKA11, KA12

Guide prices for Irvine
These guide figures apply our Scotland adjustment (×0.98) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Irvine: £1,960 to £3,720 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £53,500 – £67,500 | £58,500 – £73,500 | £73,500 – £93,500 |
| One-bedroom annexe 35 m² | £68,500 – £86,000 | £82,000 – £103,000 | £102,500 – £130,500 |
| Larger annexe 45 m² | £88,000 – £110,500 | £105,500 – £132,500 | £132,000 – £168,000 |
For a figure based on your own dimensions, use our guide-price tool.
Will the council need to approve it?
In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.
Applications are decided by your council as planning authority.
What we take care of
- Fire separation and alarms to building regulations
- Separate or shared heating and hot water
- Planning application describing ancillary use
- Design for accessibility: level thresholds, wider doors, walk-in shower
Accessibility is cheaper to design in than to retrofit. Level access, a 900 mm door width, a level-access shower and space to turn a wheelchair can all be planned into the footprint for little extra cost.
Covering Irvine
Postcode districts we cover around Irvine include KA11, KA12. We also work in nearby Kilwinning (3 miles), Troon (5 miles), Saltcoats (5 miles), Kilmarnock (6 miles).
Johnstone, in Renfrewshire and Inverclyde, is roughly 15 miles from Irvine and also on our list. Across Scotland, extensions follow Scottish planning and building standards, including the building warrant process, which we build into the programme from the start.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Irvine home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about an annexe extension in Irvine
How long does an annexe extension take to build in Irvine?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 10–16 weeks design and approvals.
Do I need building regulations approval in Irvine?
Yes. Almost every extension needs it, whatever the planning route. In Scotland that means a building warrant before work starts.
Who do I contract with for an annexe extension in Irvine?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can the annexe have its own front door?
Yes, many do, but it should still connect to the main house to stay clearly part of it.
Does an annexe extension need planning permission?
Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.
Book a free site visit in Irvine
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.