Annexe extensions in Gosforth
Planning an annexe extension in Gosforth? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in GosforthFrom £50,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsNE1, NE2, NE3, NE4, NE7

When an annexe extension makes sense
- Homes with a large side or rear garden
- Relatives who need support close by
- Multi-generational families
Covering Gosforth
Our survey diary covers Gosforth, including NE1, NE2, NE3, NE4, NE7. Neighbouring towns we cover include Newcastle upon Tyne (2 miles), Gateshead (3 miles), Wallsend (3 miles), Felling (4 miles).
Just over the Northumberland border, Cramlington is about 6 miles away. The North East has many brick terraces, colliery-era housing and post-war semis, with rear extensions and kitchen extensions the most common requests.
Guide prices for Gosforth
Labour and material costs vary across the UK, so for Gosforth we use our North East England factor (×0.91). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Gosforth: £1,820 to £3,460 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £50,000 – £63,000 | £54,500 – £68,500 | £68,000 – £86,500 |
| One-bedroom annexe 35 m² | £63,500 – £80,000 | £76,000 – £96,000 | £95,500 – £121,500 |
| Larger annexe 45 m² | £81,500 – £102,500 | £98,000 – £123,000 | £122,500 – £156,000 |
Try the guide-price tool to see a range for your own size and finish.
Do I need planning permission in Gosforth?
In England an annexe that stays part of the household and connects to the house is assessed as an extension, but its size usually takes it beyond permitted development, so a householder application describing the ancillary use is the normal route.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about annexe extensions
Do you cover all of Gosforth?
Yes. We cover Gosforth and the surrounding parts of Tyne and Wear. Site visits are free and there is no obligation.
Who do I contract with for an annexe extension in Gosforth?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
How long does an annexe extension take to build in Gosforth?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 10–16 weeks design and approvals.
Will an annexe affect council tax?
It can. Some annexes are assessed separately for council tax, with discounts or exemptions in some cases when occupied by a relative. Check with the Valuation Office Agency (England and Wales), your local assessor (Scotland) or Land & Property Services (Northern Ireland).
Does an annexe extension need planning permission?
Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.
Book a free site visit in Gosforth
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.