house-extension.uk

Annexe extensions across Chepstow

Planning an annexe extension in Chepstow? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in ChepstowFrom £51,000 inc VAT
  • PlanningUsually a planning application
  • Build time16–24 weeks on site
  • Postcode districtsNP16
Single-storey annexe extension with its own front door and canopy

Covering Chepstow

Our survey diary covers Chepstow, including NP16. We also work in nearby Monmouth (11 miles), Newport, Gwent (14 miles), Cwmbran (14 miles), Pontypool (16 miles).

Risca, in Mid Glamorgan, is roughly 18 miles from Chepstow and also on our list. In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

Guide prices for Chepstow

Labour and material costs vary across the UK, so for Chepstow we use our Wales factor (×0.93). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Chepstow: £1,860 to £3,530 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Studio annexe
25 m²
£51,000 – £64,000£55,500 – £70,000£69,500 – £88,500
One-bedroom annexe
35 m²
£65,000 – £81,500£78,000 – £98,000£97,500 – £124,000
Larger annexe
45 m²
£83,500 – £105,000£100,000 – £126,000£125,500 – £159,500

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Chepstow?

In Wales an annexe linked to the house and used by your household is assessed as an extension, but its size usually means a planning application is needed.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

What we take care of

  • Fire separation and alarms to building regulations
  • Separate or shared heating and hot water
  • Kitchenette, shower room and bedroom finish
  • Planning application describing ancillary use

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Annexe extension questions answered

Who do I contract with for an annexe extension in Chepstow?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do you cover all of Chepstow?

Yes. We cover Chepstow and the surrounding parts of Gwent. Site visits are free and there is no obligation.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Chepstow, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Can the annexe have its own front door?

Yes, many do, but it should still connect to the main house to stay clearly part of it.

Does an annexe extension need planning permission?

Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.

Book a free site visit in Chepstow

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote